Reference no: 1018
Date: 29/03/2017
Design Brief : Luke came out to see us requiring a tray to be fabricated to replace the factory tub body to give him more room to work out of for his business.
After Sitting down and discussing what it was he required we drew up in our Solidworks CAD system the tray you see in the rendering.
The tray was fitted with a 4 inch Front headboard and a 4 inch removable Rear Headboard. We fitted 2 x underbody Toolboxes, trundle tray with central locking, 2 above body toolboxes with custom fit outs on either side with central locking also. As always we fitted Narva LED Lights and number Plate lights.
We also coated the Floor and the Back of the toolboxes in Rhino Coating to give it a harder wearing surface to last longer.
The Colour Matched 2 Pac paint for the Vehicle came out great and we hope that Luke is happy with his new Tray.
Call us today to find out what Luke Bodyworks can do for you