Archive for September, 2014

Ford Ranger Dual Cab

Posted on:

Customer Name : David Bubb – D J Building and Constructions .

Design Brief : David requested a Custom tray body to be commissioned by Luke Bodyworks with all the bells and whistles – trundle tray ,under body tool boxes, 3 inch pipe loading board , custom loading board insert with his company logo in it ,  Alloy Above Body Tool box , Alloy tie down track, LED Taillights  all Painted to match the body.